Weber Road and Galbreath Way

This project will provide the full depth reclamation of the existing roadways with cement treated base and 5 inches of HMA surfacing, as well as the following: Removal and replacement of approximately 100 LF of storm piping; Installation of 2 type 1 catch basins and 1 type 2 grate inlet; Installation of approximately 90 SY of cement concrete driveway and 145 SY of sidewalk.
  Specifications (click to expand/collapse)

The Standard Plans are available under the "Addendum/Other" tab.

Name Size
Specs 3.6 MB