Vera Water & Power Ball Booster Station Replacement Project

The work consists of construction of an approximate 2,200 SF pump station building including site piping and site drainage; interior electrical, piping, plumbing, valves and HVAC; site grading and improvements; approximately 1,100 LF of 8-inch to 14-inch transmission and distribution mains, fire hydrant and eight service reconnections and related pavement and surface restoration.
  04 - Specifications - By Division (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
Cover & Table of Contents 319.0 KB
Division 00 - Procurement and Contracting Requirement 1.0 MB
Division 01 - General Requirements 327.1 KB
Division 03 - Concrete 159.2 KB
Division 04 - Masonry 56.5 KB
Division 05 - Metals 36.0 KB
Division 06 - Wood, Plastics, and Composites 59.0 KB
Division 07 - Thermal and Moisture Protection 70.5 KB
Division 08 - Openings 128.2 KB
Division 09 - Finishes 57.8 KB
Division 31 - Earthwork 194.0 KB
Division 32 - Exterior Improvements 155.0 KB
Division 33 - Utilities 179.9 KB
Division 40 - Process Interconnections 68.4 KB
Division 41 - Material Processing and Handling Equipment 142.0 KB
  05 - Specifications - Batch PDF (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
Vera Ball Booster COMBINED 2.9 MB